The 1200m open area lighting and supply lines of Tunçbilek Train Station, which belongs to the State Railways, were pulled from underground with horizontal drilling, 12 lighting projector poles were erected and the projectors were installed and commissioned by us, and the train traffic was not interrupted during these operations. Toplam Power of the Plant : 1.000 KVA