Project for Renewable Energy

Project Information
  • Customer: BURULAŞ
  • Location: Bursa
  • Year: 2020
  • Capacity: 30 Metro İstasyonu
  • Time: 1 Yıl
  • Sector: Ulaşım
About Project

As Bursa Tek Energy, we supply the energy used by BURULAŞ light rail system stations with solar power plants we have installed on the roofs of 30 stations. This project is the first and only build-operate-transfer model in Turkey. Total Power of 30 Stations: 1986 kWh. The installation period of the work is 1 year.