DC 9.5 KW Off Grid GES

Project Information
  • Customer: Özel
  • Location: Bursa
  • Year: 2021
  • Capacity: DC 9.5 KW
  • Time: 1 Ay
  • Sector: Özel
About Project

An off-grid system with DC 9.5 KW power in the garden of a villa in Bursa Mudanya was established. In order to obtain optimum efficiency from the system, the installation is carried out on the south side with the usage of suitable aluminum profile construction.